Wiki » History » Version 13
Eva Rodriguez, 06/19/2015 08:33 PM
1 | 5 | Eva Rodriguez | h1. Google Summer of Code 2015 |
---|---|---|---|
2 | 1 | Eva Rodriguez | |
3 | 1 | Eva Rodriguez | |
4 | 5 | Eva Rodriguez | h1. Port Network Analysis Extension to gvSIG 2.x branch |
5 | 1 | Eva Rodriguez | |
6 | 1 | Eva Rodriguez | My proposal is to develop a plugin to migrate all features of route calculation from the 1.* gvSIG version to the latest one. These are the main tasks to do: |
7 | 1 | Eva Rodriguez | |
8 | 1 | Eva Rodriguez | * Route management to get the shortest path |
9 | 1 | Eva Rodriguez | * Optimizing the order of stops on a route |
10 | 1 | Eva Rodriguez | * Calculation of service areas |
11 | 1 | Eva Rodriguez | * Location of the nearest event |
12 | 1 | Eva Rodriguez | * Calculate matrices Origin - Destination |
13 | 1 | Eva Rodriguez | * Calculation of minimum spanning tree |
14 | 1 | Eva Rodriguez | |
15 | 1 | Eva Rodriguez | h2. Introduction |
16 | 1 | Eva Rodriguez | |
17 | 1 | Eva Rodriguez | GvSIG, as thick client desktop GIS, is a viable free solution in their latest versions in which there has been a refactoring, but is missing features that it had, for example, Network Analysis Extension. |
18 | 1 | Eva Rodriguez | |
19 | 1 | Eva Rodriguez | The aim of this project is to port this extension developed on versions "1. *" to versions "2. *", to perform the same processes in the last version. |
20 | 1 | Eva Rodriguez | |
21 | 1 | Eva Rodriguez | |
22 | 1 | Eva Rodriguez | h2. Background |
23 | 1 | Eva Rodriguez | |
24 | 1 | Eva Rodriguez | I've been linked to gvSIG from the beginning as developer of many of its extensions and the base, what motivates me to try to improve the functionality offered to end users. |
25 | 1 | Eva Rodriguez | |
26 | 4 | Eva Rodriguez | Nowadays, with the refactoring, I lost some linkage, and would like to make this development to keep abreast of the latest improvements in their refactoring on gvSIG and introduce in the calculation of routes developed. |
27 | 1 | Eva Rodriguez | |
28 | 1 | Eva Rodriguez | The relationship with OSGeo would be to extend gvSIG, which is part of the partnership and shares its interest in free software. |
29 | 1 | Eva Rodriguez | |
30 | 1 | Eva Rodriguez | |
31 | 2 | Eva Rodriguez | h2. Detailed Timeline |
32 | 1 | Eva Rodriguez | |
33 | 1 | Eva Rodriguez | 1. Analysis of the gvSIG development environment changes. Definition of requirements to implement the functionality. Week 1 |
34 | 1 | Eva Rodriguez | |
35 | 1 | Eva Rodriguez | 2. Development |
36 | 1 | Eva Rodriguez | |
37 | 2 | Eva Rodriguez | 2.1. Network Analysis Extension, creating the structure. Week 2 |
38 | 1 | Eva Rodriguez | |
39 | 13 | Eva Rodriguez | 2.2. Route management to get the shortest path and refactor all elements. Week 3 - 5 |
40 | 1 | Eva Rodriguez | |
41 | 13 | Eva Rodriguez | 2.3. Optimizing the order of stops on a route and create an installer. Week 6 |
42 | 1 | Eva Rodriguez | |
43 | 13 | Eva Rodriguez | 2.4. Calculation of service areas and create an installer. Week 7 |
44 | 1 | Eva Rodriguez | |
45 | 13 | Eva Rodriguez | 2.5. Location of the nearest event. Week 8 |
46 | 1 | Eva Rodriguez | |
47 | 13 | Eva Rodriguez | 2.6. Calculate matrices Origin - Destination and create an installer. Week 9 |
48 | 12 | Eva Rodriguez | |
49 | 13 | Eva Rodriguez | 2.7. Calculation of minimum spanning tree. Week 10 |
50 | 1 | Eva Rodriguez | |
51 | 13 | Eva Rodriguez | 3. Testing of the new tool and create an installer. Week 11 |
52 | 1 | Eva Rodriguez | |
53 | 13 | Eva Rodriguez | 4. Solving errors that emerged in test phase, documentation and create an installer. Week 12 |
54 | 1 | Eva Rodriguez | |
55 | 2 | Eva Rodriguez | |
56 | 2 | Eva Rodriguez | |
57 | 2 | Eva Rodriguez | |
58 | 2 | Eva Rodriguez | h2. Week 1 |
59 | 2 | Eva Rodriguez | |
60 | 2 | Eva Rodriguez | This is my first report for the *Port Network Analysis Extension to gvSIG 2.x branch* project. |
61 | 2 | Eva Rodriguez | |
62 | 2 | Eva Rodriguez | 1) What do I have completed this week? |
63 | 2 | Eva Rodriguez | |
64 | 9 | Eva Rodriguez | * I wrote in this wiki. [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/wiki]] |
65 | 9 | Eva Rodriguez | * I have analysed the necessary changes for the development of version change. |
66 | 9 | Eva Rodriguez | * I have defined of requirements to implement the functionality. |
67 | 9 | Eva Rodriguez | * I have initiated the development of the creation of the graph network to use the new structure created in gvSIG for data processing and data access. |
68 | 9 | Eva Rodriguez | * The SVN repository [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/repository]] |
69 | 2 | Eva Rodriguez | |
70 | 2 | Eva Rodriguez | 2) What am I going to achieve for next week? |
71 | 1 | Eva Rodriguez | |
72 | 1 | Eva Rodriguez | I want to create the Network Analysis Extension, creating the structure to next uses by other extensions to calculate the route. |
73 | 1 | Eva Rodriguez | |
74 | 1 | Eva Rodriguez | 3) Is there any blocking issue? |
75 | 1 | Eva Rodriguez | |
76 | 1 | Eva Rodriguez | I had problems with the user gvSIG SVN repository to upload the changes I made in the code. |
77 | 10 | Eva Rodriguez | |
78 | 10 | Eva Rodriguez | |
79 | 10 | Eva Rodriguez | h2. Week 2 |
80 | 10 | Eva Rodriguez | |
81 | 10 | Eva Rodriguez | |
82 | 10 | Eva Rodriguez | 1) What do I have completed this week? |
83 | 10 | Eva Rodriguez | |
84 | 10 | Eva Rodriguez | * I wrote in this wiki. [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/wiki]] |
85 | 10 | Eva Rodriguez | * I have finished the development of the creation of the graph network to use the new structure created in gvSIG for data processing and data access. |
86 | 1 | Eva Rodriguez | * The SVN repository [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/repository]] |
87 | 1 | Eva Rodriguez | |
88 | 1 | Eva Rodriguez | 2) What am I going to achieve for next week? |
89 | 1 | Eva Rodriguez | |
90 | 1 | Eva Rodriguez | I want to create Route management to get the shortest path and create an installer. |
91 | 1 | Eva Rodriguez | |
92 | 1 | Eva Rodriguez | 3) Is there any blocking issue? |
93 | 1 | Eva Rodriguez | |
94 | 1 | Eva Rodriguez | No problems. |
95 | 12 | Eva Rodriguez | |
96 | 12 | Eva Rodriguez | |
97 | 12 | Eva Rodriguez | h2. Week 3 |
98 | 12 | Eva Rodriguez | |
99 | 12 | Eva Rodriguez | |
100 | 12 | Eva Rodriguez | 1) What do I have completed this week? |
101 | 12 | Eva Rodriguez | |
102 | 12 | Eva Rodriguez | * I wrote in this wiki. [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/wiki]] |
103 | 12 | Eva Rodriguez | * I solved the translated texts of the panels. |
104 | 12 | Eva Rodriguez | * I started to calculate the route management to get the shortest path. |
105 | 12 | Eva Rodriguez | * The SVN repository [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/repository]] |
106 | 12 | Eva Rodriguez | |
107 | 1 | Eva Rodriguez | 2) What am I going to achieve for next week? |
108 | 1 | Eva Rodriguez | |
109 | 1 | Eva Rodriguez | I want to finished Route management to get the shortest path and create an installer. |
110 | 1 | Eva Rodriguez | |
111 | 1 | Eva Rodriguez | 3) Is there any blocking issue? |
112 | 1 | Eva Rodriguez | |
113 | 1 | Eva Rodriguez | I found problems in the core of gvsig and have opened two tickets: |
114 | 1 | Eva Rodriguez | |
115 | 1 | Eva Rodriguez | * [[https://redmine.gvsig.net/redmine/issues/3588]] |
116 | 1 | Eva Rodriguez | * [[https://redmine.gvsig.net/redmine/issues/3587]] |
117 | 13 | Eva Rodriguez | |
118 | 13 | Eva Rodriguez | h2. Week 4 |
119 | 13 | Eva Rodriguez | |
120 | 13 | Eva Rodriguez | |
121 | 13 | Eva Rodriguez | 1) What do I have completed this week? |
122 | 13 | Eva Rodriguez | |
123 | 13 | Eva Rodriguez | * I wrote in this wiki. [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/wiki]] |
124 | 13 | Eva Rodriguez | * I refactor Flag, Cost, Edge... to estract the interface. |
125 | 13 | Eva Rodriguez | * I continue to calculate the route management to get the shortest path. |
126 | 13 | Eva Rodriguez | * The SVN repository [[https://redmine.gvsig.net/redmine/projects/gvsig-networkanalysis/repository]] |
127 | 13 | Eva Rodriguez | |
128 | 13 | Eva Rodriguez | 2) What am I going to achieve for next week? |
129 | 13 | Eva Rodriguez | |
130 | 13 | Eva Rodriguez | I want to finished Route management to get the shortest path, end the refactor and create an installer. |
131 | 13 | Eva Rodriguez | |
132 | 13 | Eva Rodriguez | 3) Is there any blocking issue? |
133 | 13 | Eva Rodriguez | |
134 | 13 | Eva Rodriguez | I found problems to refactor some elments. |