gvSIG bugs #1270
The result of merge geoprocess with DXF layers is an empty layer
Status: | Closed | % Done: | 0% | |
---|---|---|---|---|
Priority: | Low | Spent time: | - | |
Assignee: | Ignacio Brodín | |||
Category: | Geoprocess | |||
Target version: | 2.0.0-rc5 | |||
Severity: | Add-on version: | |||
gvSIG version: | 2.0.0 | Add-on build: | 2064 | |
gvSIG build: | 2056 | Add-on resolve version: | ||
Operative System: | Linux | Add-on resolve build: | ||
Keywords: | Proyecto: | |||
Has patch: | No | Hito: | ||
Add-on name: | Unknown |
Description
Open gvsig
Add new view
Select 'Add layer' button
Add layer 'V0813_LaRioja_2.dxf' (http://downloads.gvsig.org/download/geodata/vector/SHP2D/V0813_LaRioja_2/V0813_LaRioja_2.zip)
Add layer 'V0813_LaRioja_1.dxf' (http://downloads.gvsig.org/download/geodata/vector/SHP2D/V0813_LaRioja_1/V0813_LaRioja_1.zip)
Click Open
Click on OK
Click on 'Merge' from gvSIG geoprocessing tools
Activate the checkbox 'Select all layers'
Select V0813_LaRioja_1.dxf as a Field
Save the Merge in a temporary file
Click Ok
The result is an empty layer
History
#1 Updated by Manuel Madrid over 11 years ago
- Priority changed from Normal to Low
#2 Updated by Joaquín del Cerro Murciano over 11 years ago
- Target version changed from 2.0.0-rc1 to 2.0.0-final
#3 Updated by Manuel Madrid over 11 years ago
- Target version deleted (
2.0.0-final)
#4 Updated by Ignacio Brodín over 11 years ago
- Status changed from New to Fixed
- Assignee set to Ignacio Brodín
- Target version set to 2.0.0-final
- Add-on build set to 2064
That was resolved. As a result, now generates three shapefiles, point, lines and polygons
#5 Updated by Joaquín del Cerro Murciano over 11 years ago
- Target version changed from 2.0.0-final to 2.0.0-rc5
#6 Updated by Álvaro Anguix about 10 years ago
- Status changed from Fixed to Closed